Skip to content

Support

Installation guide

Every GLARA unit ships with a wall-mount rail, a template, and torque-rated fixings. Installation takes one technician about ninety minutes.

Before the team arrives

Have the water isolated at the shut-off and the wall clear to 20 cm beyond the unit on each side. Tiled walls are fine; we drill through glaze with a diamond bit.

Marking the rail

Tape the paper template to the wall at 85 cm from finished floor level. The plumbing rough-in has to land inside the shaded zone — if it doesn't, call us before drilling.

Fixings by wall type

Brick and block take the supplied 8 mm sleeve anchors. Drywall needs the backing plate in the box, fixed to studs — never to plasterboard alone.

Hanging and levelling

Lift the cabinet onto the rail, then adjust the two cams behind the top drawer until the shadow gap reads even along its full length.

Talk to us

Custom projects, trade accounts, or a question about a unit.

Installation guide — GLARA